Tunnel

Tunnel

You can enjoy "the world of 140 m below the surface of the sea".
We lead you there by "Tappi inclined passage line".

Seikan tunnel goes through the seabed of Tsugaru Straits.
Please experience the tunnel really used for the work of construction and feel this great project for 24 years.
This touring experience takes about 45 minutes.

Seikan Tunnel Tappi inclined passage line, called Mogura (mole) train

Seikan Tunnel Tappi inclined passage line, called Mogura (mole) train

The shortest private railroad in the world, “Seikan Tunnel Tappi inclined passage line, called Mogura (mole) train” was constructed for moving laborers or transporting shortage through the Seikan Tunnel project. It is connected to the Honsyu side, Tappi-fixed-point (Tappi undersea station).
This train goes through the inclined passage 14 degree and leads you to “the world of 140 m below the surface of the sea” in only 9minutes.

Exhibition area in the Tunnel

Exhibition area in the Tunnel

We set up an Exhibition area in the Tunnel which was really used for the operation, and show you machines or devices used for digging. We reproduce and display the ambience of the field at the day.

Tunnel

Tunnel